Showing posts with label Rigging. Show all posts
Showing posts with label Rigging. Show all posts

Sunday, July 25, 2010

Combi-Trailer

I had a great afternoon yesterday sailing the Wayfarer single handed in a force 3 wind at Killington. The boat zipped along very nicely, and I had no idea that 2 hours had passed when I came into to sort the problem with the goose-neck.
I went up simply to swap the boat from the original trailer onto a second hand combi trailer I had bought. Pete Lawson was teaching a level 2 safety boat course, so it was quite comforting to know that there was a safety boat on hand. They were the only other people there when I arrived, although a couple arrived after me and took out their Enterprise later on.
When Pete had finished teaching, he showed me how to attach the launching trolley to a tow bar, which makes it easier to get up the ramp, and how to load the launching trolley on the road trailer. I may leave it off the road trailer most of the time, as it was a little awkward.
We also ran through the procedure for taking the mast down. 1. Make the boat level, 2. undo the side shrouds, 3. undo forestay keeping it tight until you can get in and hold the mast, 4. secure the stays to the mast with tape, 5. lift the mast and place it on the ground, 6. hold it vertical against the side of the boat as you get out, 7. hold the bottom in place with a foot as you lower it to horizontal. It is easier with two people at 3 5 6 & 7.

Sunday, May 16, 2010

Reefing

My first thought about reefing was the ties around the boom along the foot of the sail, that are each tied with a reef knot, but these need to the the last thought, not the first.
At either end of this line of reef points is a cringle, a ring in the sale, one on the luff, that becomes the new tack, and one on the leech, that becomes the new clew.
First, obviously, lower the main sail partially, then using a length of thin rope, tie the cringle in the luff (nearest the mast) to the boom.
Then using another length, pass the rope between the cringle on the leech (side furthest from the mast) and the clew, getting as tight as possible, then, at the cringle, tie the rope tight round the boom.
Once the tack and the clew are resolved, then the ties along the boom can be tied, using a series of reef knots.

How to rig an RS Feva

I sailed with just a single sail, so these notes deal with the main sail only.
The two ends of the halyard appear to be interchangeable, as neither run inside the mast.  One had a ball at the end, so I attached that to the head.  Then, starting with the head, the luff of the sale feeds into the mast as you tighten the halyard.
Tighten the halyard as hard as you can; it does not matter if there is a gap between the boom and the sail; get the sail as high as you can.  The halyard was fixed with a cleat, pulled from top to bottom.
The boom has part of a circle which fits round the mast, just above a rest on the mast.
Next attach the Tack (corner between mast and boom). We used a short piece of thin rope.  I guess this could be tied onto the tack, but we tied one end to a bar on the cleat piece, passed it through the tack, and down to the cleat.  Even pulled tight, there was a gap between the sail and and the boom.
After the tack we tightened the outhaul. This was another length of thin rope, tied to the clew, round a hook at the end of the boom and pulled tight by a cleat on the boom.
Finally tighten the kicking strap.
So, the order is halyard, tack, outhall, kicking strap.